WZC Sint Vincentius, Kalmthout, Belgium

  • Type de bâtiment:
  • Bâtiments médicaux
Plein écran Fermer

The initial plan was to use concrete beams for this project. However, they were replaced by DELTABEAM® Composite Beams as the use of DELTABEAM® enabled easier and faster construction in the project.

Détails du Projet

Entreprise de construction:
Strabag Belgium
Designer structurel:
Establis
Architect:
BVBA Architectenbureau Jef Van Oevelen
Année de réalisation:
2014
Année de livraison:
2015

Consultez nos experts