Peikko was responsible for the foundation design with the structural calculations and delivered all of the steel components to the 50 wind turbine foundation. The deliveries included FATBAR® rock anchors, tower adapter plate with tower flange connection bolts, drilling templates- and assembling system, and a special reinforcement steel technology.
The wind park was developed by Zephyr and Norsk Vind Energi, and their project investor is BlackRock. Google has bought the entire 12-year power production of the wind park, to supply their European data centers with renewable energy. The wind park was completed and put into operation in September 2017.
The heavy maschinery contractor Stangeland Maskin AS, was responsible of the civil earthworks and infrastructure. Their subcontractor Skanska AS carried out the technical assembly of steel components and casting works of the Peikko Rock Anchored Foundations. Siemens delivered 50 of their SWT-3.2MW-113 turbines with hub heights of 93 meters.
Peikko delivered FATBAR® Rock Anchors, rock adaptor plates and tower bolts, drilling template- and assembling system, special reinforcement steel technology.
Peikko is also responsible for the structural metrics associated to the design of the Rock Anchor Foundation.