Technology Centre for Offshore and Marine, Singapore (TCOMS), Queenstown, Singapore

  • Type de bâtiment:
  • Éducation et culture
Plein écran Fermer Street view

Precast concrete wall connections for Deepwater Ocean Basin were made with SUMO Wall Shoes and HPKM Column Shoes. Bolted connection systems provided faster construction method for precast construction.

Détails du Projet

Étages:
4
Développeur:
National University of Singapore
Entreprise de construction:
Lian Soon Construction Pte Ltd
Année de réalisation:
2017
Année de livraison:
2018

Consultez nos experts

Topi Laiho

Topi Laiho

Product Manager

Bolt Connections

Cell 040 776 2503
[email protected]