Reepham School - 6th Form Block, Norwich, UK

  • Type de bâtiment:
  • Éducation et culture
Plein écran Fermer Street view

DELTABEAM® used within a precast frame to produce a slim floor with no downstand. Ceiling is exposed to fully utilize thermal pass properties of Hollow-core concrete floor and afford economic robust build. Extremely rapid construction programme employed significant off site manufacture.

Détails du Projet

Développeur:
Kier Construction
Entreprise de construction:
PCE Ltd.
Designer structurel:
PCE Ltd.
Année de réalisation:
2009
Année de livraison:
2010

Consultez nos experts