MOL Arena, Slovakia

  • Type de bâtiment:
  • Centres sportifs
Plein écran Fermer

MOL Arena in Dunajská Streda is the home stand of the city's football club DAC 1904. It was built from the ground up on the site of the original Dunajská Streda football stadium in 2016-2018.

This state-of-the-art football stadium was built using a modern prefabricated system that ensured speed, precision, and reliability. Peikko solutions played a key role: HPM® and PPM® anchor bolts, together with HPKM® and PEC® column shoes, provided strong and efficient connections for the prefabricated elements. In addition, HPM® and COPRA® bolted connections were used to secure the steel roof to the columns with ease. Thanks to these innovative components, the installation of the columns was fast and straightforward, dramatically reducing construction time while guaranteeing long-lasting structural performance.

Lire la suite down-arrow.png

Détails du Projet

Taille du projet:
9,275 m2
Étages:
4 (1 underground + 3 overground)
Développeur:
DAS Aréna, a.s.
Entreprise de construction:
AVA-stav, s.r.o.
Architect:
ADIF, s.r.o.
Pré-fabricant de béton:
STRABAG Pozemné staviteľstvo s.r.o.
Année de réalisation:
2016 – 2018
Année de livraison:
2018

Consultez nos experts

Mihálek Gabriel Ing.

Mihálek Gabriel Ing.

Manažér predaja Slovensko

Cell 00421/911 260 499
[email protected]