For up to 246 precast concrete columns of the new complex of Hornbach in Amsterdam, Peikko Benelux has supplied its HPKM® Column Shoe Connection with KOMO approval. The assembly was faster, easier and safer in comparison to the traditional method.

For me it was a new system. I'm extremely satisfied. It works faster and easier because no temporary braces are needed. You have more space on the building site, for example, the aerial work platforms, and it also works safer.

Project Manager of ‘BAM Construction and Engineering’

Détails du Projet

Taille du projet:
20,000 m2
Entreprise de construction:
BAM Bouw & Techniek regio Noordwest, Amsterdam
Designer structurel:
Ingenieursbüro Fischer + Schmid, Karlsruhe
Architect:
KUBUS architektuur + stadplanung, Wetzlar
Année de réalisation:
2016
Année de livraison:
2017