Glumsø Railway Station Bridge, Glumsø, Denmark

  • Type de bâtiment:
  • Infrastructure
Plein écran Fermer

In the small town of Glumsø on Seeland did the Danish National Railway Agency build a walkway in a very short time due to a tight and demanding time schedule.

The reason for the tight schedule was caused by wish to minimize the closing of the link between Germany and Copenhagen to only 24 hours. The engineers on the project solved the challenge by making the bridge prefabricated in steel.

The moment stiff concrete columns and the additional foundations would usually have been in-situ casted, but this was not possible this time. So the contractor started to look for a precast solution where the foundation and columns could be assembled fast with Peikko Column shoe and Anchor bolts.     

Lire la suite down-arrow.png

Détails du Projet

Développeur:
Danish Railway
Entreprise de construction:
Per Aarsleff
Designer structurel:
Cowi/ Niras
Année de réalisation:
2009
Année de livraison:
2009

Consultez nos experts

Jonas Høg

Jonas Høg

Direktør

Bygningsingeniør

Cell +45 5120 5658
[email protected]