BEP Precast Factory, Indonesia

  • Type de bâtiment:
  • Bâtiments industriels

Peikko Products were used in the extension of BEP Precast Factory in years 2014-2015. Peikko supplied total 324 column shoes and same quantity of Anchor Bolts. Supplied products were different HPM® L Anchor Bolts, HPKM® Column Shoes together with various accessories.

Détails du Projet

Développeur:
PT Beton Elemenindo Perkasa
Entreprise de construction:
PT Beton Elemenindo Perkasa
Designer structurel:
PT Beton Elemenindo Perkasa
Année de réalisation:
2014
Année de livraison:
2015

Consultez nos experts