Eumseong Combined Power Plant Cooling Tower Project, Eumseong-gun, Chungcheongbuk-do, South Korea

  • Type de bâtiment:
  • Bâtiments écoenergétiques
Plein écran Fermer

This project marks Peikko’s third cooling tower project in Korea, and it holds particular significance as a public-sector project.

One of the key benefits of applying Peikko’s solution to this project was the remarkable speed of installation. By combining precast concrete construction with Peikko’s innovative connection systems, the overall construction period was reduced by more than two months compared to traditional cast-in-place methods. Moreover, the entire project was completed without any safety incidents.

The site was visited by representatives from universities, corporations, and public institutions, all of whom gave positive feedback on Peikko’s dry joint solution for precast concrete. This project clearly demonstrates how Peikko’s technology can enhance both efficiency and safety in modern construction.

Lire la suite down-arrow.png

Détails du Projet

Taille du projet:
10 cooling towers m2
Développeur:
KOREA EAST-WEST POWER CO.,LTD
Entreprise de construction:
POSCO E&C
Designer structurel:
RISE STRUCTURAL ENGINEERING
Architect:
TAEHWA ENGINEERING CO., LTD (SHOP DESIGN)
Pré-fabricant de béton:
KOREA OCEAN PLATFORM CO.,LTD
Année de réalisation:
2023~2024
Année de livraison:
2024